Episode 5
How to Put Your Shoot on the Calendar with the Production Schedule
Set a shooting block's dates, paint prep, rehearsal and wrap days, drag a shoot day to a new date without losing its scenes, set call times, and add a post-production lane with a picture lock.
Recorded against The Long Way Home. To build the same project as you watch, download the project files (5 MB).
In this episode
- 0:00 Introduction
- 0:23 The block and its dates
- 1:23 Painting day types
- 2:18 Moving a shoot day
- 3:38 The day panel
- 4:28 A lane for post-production
- 5:40 Other ways to look at it
- 6:07 Summary and next steps
So far the eight shoot days of The Long Way Home are numbered, but they aren’t on the dates we want. In this episode we use the Production schedule to put the shoot on the calendar, with prep, a rehearsal, a day off and a wrap day. We also move a shoot day without losing any of the work attached to it, and add a lane for post-production. For the wider picture, see the film scheduling software page.
The dates below are the ones the series uses, from late November 2026 to January 2027. If you’re scheduling your own production, use your own dates.
Step 1: Rename the Block and Set Its Dates
The Production schedule has three views. Start with the Timeline, which shows every phase of the production as a lane.
- On the Schedule tab, select Production schedule in the sidebar.
- Click the Timeline view button. The lane column, headed Lane, shows Block 1 with Shoot lane under its name.
- Click the pencil beside it (tooltip “Edit”). The lane panel opens.
Type, at the top, says what the lane is for: Shoot, Prep, Post or Other. Shoot makes it a shooting block, the kind that has a stripboard and numbered shoot days. Leave it on Shoot.
- Replace the text in Lane name with
Main Unit. - Set Start date to Monday, November 30, 2026, and End date to Saturday, December 12, 2026.
We start with two days of prep and finish with a wrap day. Shoots on lists the weekdays the block shoots on, which is Monday to Friday unless you change it. Days you can paint lists the day types this lane uses: Shoot, Prep, Rehearsal, Travel, Off and Wrap.
- Close the panel with its cross. The panel saves each change as you make it.
Step 2: Read the Calendar
- Click the Calendar view button. If it opens on another month, use the arrows to go to December 2026. The December grid starts on Sunday, November 29, so the block’s first date, Monday, November 30, is in its first row.
The eight shoot days have taken the block’s first eight weekdays, in board order. Each day lists its first scenes, and a line with the number of scenes, pages, cast and company moves, so a heavy day is easy to spot.
Step 3: Paint the Prep Days
Every date in a lane has a day type, and you change it by painting. Painting is off when you open the page, so a click on a date just opens it.
- Open the day type menu beside Paint in the toolbar and pick Prep. Picking a type turns Paint on, and the button stays highlighted while it is on.
- Press on November 30 and drag to December 1, then let go.
Both dates become prep, and the shoot days move on to the next shoot dates. Each day takes its scenes and its call sheet with it, so nothing you’ve planned is lost. Shoot 1 is now on Wednesday, December 2, and Shoot 8 on Friday, December 11.
Step 4: Move the Market Day to Saturday and Paint the Rehearsal
The farmers’ market has to be shot on a real market Saturday. On our board it’s the first day, Shoot 1.
- Press on the Shoot 1 pill on Wednesday, December 2, and drag it to Saturday, December 5.
While you drag, the calendar shows what will happen: Saturday becomes Shoot 3, the two days before it become Shoot 1 and Shoot 2, and Wednesday goes back to being a day off.
- Let go. A notice confirms the move, with Undo.
The market day lands on Saturday with its scenes and call sheet. Sunday, December 6 stays a day off.
- Pick Rehearsal from Paint and click Wednesday, December 2, which the move left free.
Nothing else moves. The shoot now runs Thursday, December 3 to Friday, December 11.
Step 5: Preview a Push With Option-Drag
Sometimes a day has to slip and everything after it slips with it, such as when an actor’s flight is delayed.
- Hold Option (or Alt on Windows) and drag the Shoot 4 pill from Monday, December 7 to Tuesday, December 8.
The later days are pushed back instead, and the hint under the calendar tells you where the last shoot day will land.
- We don’t need that today, so press Escape before you let go. The preview disappears and nothing changes.
Step 6: Paint the Wrap Day
- Pick Wrap from Paint and click Saturday, December 12.
The crew now has a day to return the equipment. Open the Main Unit lane panel and check that End date still reads December 12. If it reads anything else, set it back to December 12.
Step 7: Use the Day Panel
- Paint is still on from the wrap day. Click the highlighted Paint button, or press Escape, to turn it off. Now a click opens a day instead of painting it.
- Click the rehearsal day, December 2, to open it in the day panel on the right.
- Under Called, tick DOT and MILO.
Each tick puts a rehearsal on that person’s row in the Day out of Days, and in the next episodes you’ll see it paid at the actor’s rehearsal rate.
- Click Shoot 1 on December 3. The panel shows Shoot day 1, with Call, Wrap, Location, Notes and the day’s scenes.
- Type
7:00 AMinto Call and7:00 PMinto Wrap.
Open on stripboard and Call sheet take you straight to that day on those pages.
Step 8: Add a Post-Production Lane
Post-production can go on the schedule too.
- Click the Timeline view button, then Add lane in the toolbar. The panel opens with Type set to Shoot.
A second Shoot lane would be a new shooting block, such as a second unit, with its own stripboard, and a message tells you where to find it. We want post-production.
- Click Post. The weekday row changes to Works on, and Days you can paint changes to Edit, VFX, Sound, Color, Mix, Review and Off, plus two milestones, Picture lock and Delivery.
- Type
Postinto Lane name. - Set Start date to Monday, December 14, 2026, and End date to Friday, January 15, 2027.
- Click Add lane.
The new lane appears under Main Unit with Post lane under its name. Its weekdays become edit days, and the budget gets a global that counts them, which we use in Episode 7.
- Switch to Calendar view and use the arrow to go to January 2027.
- Pick Picture lock from Paint and click Friday, January 8.
Back on the Timeline, January 8 shows a diamond for the milestone.
Step 9: Holidays, Events and the Overview
- Right-click any date outside the lanes. The menu offers Add holiday, Add custom event (such as a production meeting) and Add unavailability, for a date when someone can’t work. A holiday is always a day off. Press Escape to close the menu.
- Click the Overview button. Every month of the production shows at once, colored by day type, with a legend at the top.
The Overview is handy for a long shoot or a series with several blocks.
The shoot is on the calendar: two prep days, a rehearsal on December 2, eight shoot days from December 3 to 11 with the market on Saturday the 5th, a day off on the Sunday, and a wrap day on December 12. Post has its own lane through January 15, 2027, with picture lock on January 8. In the next episode, Cast, Crew and Day out of Days, we add the cast and crew and see how those dates turn into the Day out of Days.
Common questions
How do I move a shoot day to another date without losing the scenes?
On FilmBase's Production schedule, press on the day's Shoot pill in the Calendar view and drag it to the new date. The calendar previews the result while you drag, and when you let go the day takes its scenes and call sheet with it. The other shoot days are renumbered in date order.
How do I push every later shoot day back by one day?
Hold Option on a Mac, or Alt on Windows, while you drag a shoot day. The later days are pushed back instead of staying put, and a hint under the calendar shows where the last shoot day will land. Press Escape before you let go to cancel.
What day types can a production schedule have?
In FilmBase, a Shoot lane uses Shoot, Prep, Rehearsal, Travel, Off and Wrap days. A Post lane uses Edit, VFX, Sound, Color, Mix, Review and Off days, plus two milestones, Picture lock and Delivery. A holiday is always a day off.
Can I schedule post-production in FilmBase?
Yes. Add a lane with the type Post and give it start and end dates. Its weekdays become edit days, you can paint other post day types and milestones such as Picture lock, and the budget gets a global that counts the edit days. A Post lane has no stripboard.
Try it on your own production
FilmBase runs on your own computer, and your projects stay there as files you own.
Mac · Windows